Smart industry and green development

Innovations related to saving energy as well as the promotion of sustainable development and the circular economy in all industrial processes.

The platform aims at

finding and implementing actions that promote industries’ carbon neutrality. Smart Industry uses digitalisation to develop green and smart industry.

Tools to reach targets are

Internet of Things (IoT), Artificial Intelligence (AI), Machine Learning, Big Data Analysis, Virtual Reality (VR) and Cyber ​​Security, 3D printing and robotics.

Additionally, the aim is to study and promote

opportunities for decentralised energy production in Ostrobothnia. New types of energy storage solutions and questions related to hydrogen technology.

Smart Industry research platform projects

Project
Next Generation TB (NGTB)

Next Generation TB (NGTB)

Duration of the project:

1.1.2024 - 30.11.2025

Project
Internationalization as an Enabler of Growth for Rural Entrepreneurs

Internationalization as an Enabler of Growth for Rural Entrepreneurs

Duration of the project:

1.1.2024 - 31.12.2025

Project
CHIH-K

CHIH-K

Duration of the project:

1.2.2024 - 31.1.2026

Project
Ready for Talents

Ready for Talents

Duration of the project:

1.2.2024 - 31.5.2025

Project
Promoting electricity demand response management in Ostrobothnia

Promoting electricity demand response management in Ostrobothnia

Duration of the project:

1.1.2024 - 31.12.2025

Project
Decentralized Biogas Production Ecosystem in Northern Lapland

Decentralized Biogas Production Ecosystem in Northern Lapland

Duration of the project:

1.4.2024 - 30.11.2025

Project
Farm-scale biomethane production plant for challenging raw materials

Farm-scale biomethane production plant for challenging raw materials

Duration of the project:

31.1.2024 - 30.6.2025

Project
Expert training in wind energy

Expert training in wind energy

Duration of the project:

1.1.2024 - 31.3.2025

Project
The RDI pathway for SMEs

The RDI pathway for SMEs

Duration of the project:

1.1.2024 - 31.12.2025

Project
Targeted needs of the battery value chain

Targeted needs of the battery value chain

Duration of the project:

15.8.2023 - 31.10.2024

Check out also our other RDI platforms